日韩午夜在线观看,色偷偷伊人,免费一级毛片不卡不收费,日韩午夜在线视频不卡片

行業產品

  • 行業產品

上海榮計達儀器科技有限公司


當前位置:上海榮計達儀器科技有限公司>>>>電動粗粒土擊實儀 多功能電動擊實儀 JZ-2D 上海榮計達

電動粗粒土擊實儀 多功能電動擊實儀 JZ-2D 上海榮計達

返回列表頁

參   考   價: 4300

訂  貨  量: ≥1 臺

具體成交價以合同協議為準

產品型號

品       牌

廠商性質其他

所  在  地

聯系方式:王林查看聯系方式

更新時間:2022-10-17 16:05:35瀏覽次數:233次

聯系我時,請告知來自 環保在線

產品簡介

Themultifunctionalelectriccompactorhaslightcompactionandheavycompactionfunctions,andissuitableforlaboratoryandfieldgeotechnicaltests

詳細介紹



The multifunctional electric compactor has light compaction and heavy compaction functions, and is suitable for laboratory and field geotechnical tests. It is suitable for highway, railway, water conservancy, and construction foundation filling engineering design. The standard compaction method is used to determine the relationship between soil moisture content and dry density under a certain compaction work.


The multifunctional electric compactor complies with the (GB-7960 / 87) standard. It is a mechatronics instrument developed in accordance with the Highway Test Industry Standard (T0131-93) issued by the Ministry of Communications. T0134-93), requirements for making compaction test specimens in rebound modulus test (T0135-93).


Technical indicators of multifunctional electric compactor:

★ Heavy compaction test:

Ministry standard: hammer weight 4.5 kg; drop weight height 450 mm

National standard: hammer weight 4.5 kg; drop weight height 457 mm

★ Light compaction test:

Ministry standard: Weight of 2.5 kg; drop weight height of 300 mm

National standard: hammer weight 2.5 kg; drop weight height 305 mm

Applicable test tube diameter:

Ministry standard: Φ100mm; Φ152mm

National standard: Φ102 mm; Φ152 mm

★ Hammer diameter:

Ministry standard: Φ50 mm50

National standard: Φ51 mm

Hammering speed: 30 times / minute

Motor specifications: 380 volts; 550 watts; 1400 rpm


Multifunctional electric compactor operating procedures:

★ Adjust the position of the worktable according to the diameter of the test cylinder. Before starting, manually lift the compaction hammer to confirm that the edge of the test mold is not compacted.

★ Take the prepared soil sample and pour it into the tube in 3-5 times. When the small tube is in the three-layer method, it is about 800-900g each time; in the five-layer method, the sample is about 400-500g in each layer. When using the large cylinder, the spacer should be placed on the bottom plate of the cylinder first. According to the five-layer method, each layer needs about 900-1100g of samples; when the three-layer method is used, each layer needs about 1700g. Level the surface, apply a little pressure, and then set it according to the specified number of compactions and start compaction. The real-time compaction hammer should fall freely and vertically, and the hammer marks must be evenly distributed on the soil sample surface. After the layer compaction is completed, the sample layer is "pulled", and then the "reset" key is repeated. Compact.

★ After the compaction is completed, scrape along the inner wall of the sleeve with a trowel to detach the sample from the sleeve, twist and remove the sleeve, carefully flatten the sample with the top of the cylinder, wipe the outer wall of the cylinder, and weigh. Use a demoulder to demold, and take a sample from the sample to measure its water content.

★ Pay attention to inserting the plug of the compaction head up and down before using the small tube;


Multifunctional electric compactor debugging:

★ Place the machine on a flat concrete floor.

★ Connect the wires protruding from the host to the output of the rear panel of the controller. (10 cores)

★ Connect the power cord to the input terminal on the rear panel of the controller. (4 cores)

★ Plug the power cord into the power supply.

★ Press the setting / start button on the controller to make it set.

★ Set the dial to 03.

★ Press the power on / off button to turn on the power.

★ Press the setting / start button to make it pop up and the machine will start to run.

★ After the machine stops automatically, if the hammer is lifted, the wiring is correct and it can work normally; if the hammer is dropped in the test cylinder, the motor is reversed, and any two live wires of the power plug should be replaced. Test the machine until the hammer is in the raised position after automatic shutdown.


其他推薦產品更多>>

感興趣的產品PRODUCTS YOU ARE INTERESTED IN

環保在線 設計制作,未經允許翻錄必究 .? ? ? Copyright(C)?2021 http://www.kindlingtouch.com,All rights reserved.

以上信息由企業自行提供,信息內容的真實性、準確性和合法性由相關企業負責,環保在線對此不承擔任何保證責任。 溫馨提示:為規避購買風險,建議您在購買產品前務必確認供應商資質及產品質量。

會員登錄

×

請輸入賬號

請輸入密碼

=

請輸驗證碼

收藏該商鋪

登錄 后再收藏

提示

您的留言已提交成功!我們將在第一時間回復您~
主站蜘蛛池模板: 将乐县| 汝阳县| 乌兰察布市| 寿光市| 民丰县| 卢氏县| 久治县| 马龙县| 柳林县| 丽水市| 贵溪市| 中超| 个旧市| 瑞金市| 布尔津县| 太谷县| 乐亭县| 开原市| 呼图壁县| 徐闻县| 商水县| 富锦市| 连州市| 灵宝市| 班玛县| 安国市| 贺兰县| 东兰县| 谢通门县| 霍林郭勒市| 县级市| 樟树市| 武乡县| 江阴市| 闽侯县| 平阴县| 榕江县| 舟山市| 高平市| 甘孜县| 屯门区|