一、應用范圍:
First, the scope of application:
ZJC-150KV耐電壓測試儀主要適用于固體絕緣材料如電線套管、樹脂和膠、浸漬纖維制品、云母及其制品、塑料耐電壓測試儀、薄膜復合制品、陶瓷和玻璃等介質在工頻電壓或直流電壓下擊穿強度和耐電壓時間的測試;采用計算機控制,可對試驗過程中的各種數據進行快速、準確的采集、處理,并可存取、顯示、打印。
ZJC-150KV is mainly applicable to solid insulating materials such as wire tube, resin and rubber, impregnated fiber products, mica products, plastic film, and composite products, ceramic and glass medium in the frequency of the voltage or DC voltage breakdown strength and voltage withstand test time; using computer control, the various test data process the fast and accurate data acquisition, processing, and storage, display and print.
二、滿足標準:
Two, meet the standard:
1、GB1408.1-2006《絕緣材料電氣強度試驗方法》
1. GB1408.1-2006 "test method for electrical strength of insulating materials"
2、GB1408.2-2006《絕緣材料電氣強度試驗方法
2, "GB1408.2-2006 electrical strength of insulating materials test methods
第2部分:對應用直流電壓試驗的附加要求》
Part second: Additional requirements for tests using direct voltage "
3、GB/T1695-2005《硫化橡膠工頻擊穿電壓強度和耐電壓的測定方法》
3, GB/T1695-2005 "vulcanized rubber power frequency breakdown voltage strength and voltage measurement method"
4、GB/T3333 電纜紙工頻電壓擊穿試驗方法
4, GB/T3333 cable paper power frequency voltage breakdown test method
5、HG/T 3330絕緣漆漆膜擊穿強度測定法
5. Determination of the breakdown strength of insulating coatings of HG/T 3330
6、GB12656 電容器紙工頻電壓擊穿試驗方法
6, GB12656 capacitor paper power frequency voltage breakdown test method
7、ASTM D149《固體電絕緣材料工業電源頻率下的介電擊穿電壓和介電強度的試驗方法》
7. ASTM, D149, test method for dielectric breakdown voltage and dielectric strength of solid electrical insulating materials at power frequency
三、主要技術指標:
Three, the main technical indicators:
1、輸入電壓 AC220V 50Hz
1, the input voltage AC220V 50Hz
2、輸出電壓: AC:0~150kV; DC:0~150kV
2, output voltage: AC:0 DC:0 ~ 150kV ~ 150kV;
3、輸出功率: 15kVA
3, output power: 15kVA
4、測量范圍: AC15~150kV; DC15~150kV
4, measuring range: AC15 DC15 ~ 150kV ~ 150kV;
5、測量誤差: ≤ 2%
5, measurement error: = 2%
6、升壓速率: 1kV/s~5kV/s
6, pressure rate: 1kV/s ~ 5kV/s
7、耐壓時間: 0~4H
7, pressure time: 0 ~ 4H
8、漏電流 1~30 mA可由計算機軟件自由進行設定
8, the leakage current 1 ~ 30 mA can be set free by computer software
9、電源 交流220V±10%的單相交流電壓和50Hz±1%的頻率
9, the power AC 220V + 10% single-phase AC voltage and frequency of 50Hz + 1%
10、試驗環境溫度: 15 ~ 30℃,相對濕度:0~85%能夠穩定運行。
10, test environment temperature: 15 ~ 30 DEG C, relative humidity: 0 ~ 85% can stable operation.
11、外形尺寸長×寬×高:1980mm×1220 mm×1750mm(參考)
11, the size of the long x wide * high: 1980mm * 1220 mm * 1750mm (Reference)
12、設備自重: 350Kg(參考)
12, equipment weight: 350Kg (Reference)
13、接地要求儀器需要單獨接地,接地附合國家標準要求,金屬棒深埋地下至少要1.5米以下
13, grounding requirements of the instrument needs to be grounded alone, the ground attached to the national standard requirements, metal rods buried underground at least 1.5 meters below
四、結構原理及性能特點:
Four, structural principle and performance characteristics:
1、主要由:升壓系統(高壓變壓器)、測量系統、A/D轉換器、放電系統、電極、油箱、電極定位架、計算機數據處理系統、軟件等組成;
1, mainly by: booster system (high voltage transformer), measuring system, A/D converter, discharge system, electrode, fuel tank, electrode positioning frame, computer data processing system, software, etc.;
2、計算機---A/D轉換器---測量控制系統---調壓裝置----升壓變壓器-----試樣;
2, computer ---A/D converter --- measurement and control system - voltage regulator ---- step-up transformer - sample;
3、高壓變壓器主要產生試樣所需的直流電壓;
3, high voltage transformer mainly produces the required DC voltage samples;
4、調壓器用于調節升壓變壓器輸入端電壓以產生高壓所需的輸入電壓;
4. The regulator is used to adjust the input voltage of the step-up transformer to generate the input voltage;
5、電壓測量主要是從高壓變壓器測量端測量,高壓變壓器測量端和高壓端是線性的;
5, the voltage measurement is mainly from the high voltage transformer measurement end, high voltage transformer measurement and high voltage side is linear;
6、放電系統在試驗做完以后放電,以免產生放電對人身的危害;
6, discharge system in the test after the completion of discharge, so as to avoid the harm to the human body discharge;
五、計算機系統及軟件包
Five, computer systems and software packages
1、試驗軟件是我公司研發的功能強大、操作簡單、顯示直觀的試驗軟件系統。
1, the test software is the latest research and development of our powerful, simple operation, intuitive display test software system.
2、采用計算機控制通過人機對話方式,完成對絕緣介質工頻電壓擊穿,工頻耐壓試驗。
2, the use of computer control through man-machine dialogue, to complete the dielectric breakdown of power frequency voltage, power frequency withstand voltage test.
3、試驗過程中可動態繪制出試驗曲線,試驗的曲線可以多種顏色疊加對比,局部放大,曲線上任意一段可進行區域放大分析;
3, the test process can be drawn dynamically test curve, the test curve can be a variety of color superposition contrast, local amplification, arbitrary section of the curve can be analyzed in the region;
4、可對試驗數據進行編輯修改,靈活適用;
4, the test data can be edited and modified, flexible application;
5、試驗條件及測試結果等數據可自動存儲;
5, test conditions and test results and other data can be stored automatically;
6、試驗報告格式靈活可變,適用于不同用戶的不同需求;
6, flexible test report format, suitable for different needs of different users;
7、可對一組試驗中曲線數據的有效與否進行人為選定;
7, can be a group of test data in the curve of the effectiveness of artificial selection;
8、試驗結果數據可導入EXECL,WORD文檔編輯;
8, test results can be imported into the EXECL, WORD document editing;
9、軟件設備人員管理功能,試驗人員可設置自己的試驗項目和試驗參數,設置自己的試驗內容后別人無法進入程序;
9, software equipment personnel management functions, the test personnel can set their own test items and test parameters, set their own test content after the others can not enter the program;
10、過電流保護裝置有足夠的靈敏度,能夠保證試樣擊穿時在0.1S內切斷電源;
10, over-current protection device has enough sensitivity to ensure that the sample breakdown in the 0.1S cut off the power supply;
11、儀器運行的持久性: 儀器可連續運行使用,不需為保護儀器而定期停機。
11, the operation of the instrument persistence: the instrument can be used for continuous operation, without the need to protect the instrument and regular shutdown.
六、安全說明:
Six, safety instructions:
1、設備要安裝單獨的保護地線。接保護地線,主要是減少試樣擊穿時對周圍產生的較強的電磁干擾。也可避免控制計算機失控。
1, the equipment to install a separate protective ground wire. The protective earth wire is mainly used to reduce the electromagnetic interference caused by the breakdown of the sample. Can also avoid the control computer out of control.
2、直流試驗放電報警功能:在設備做完直流試驗時,當開啟試驗門時設備會自動報警,直至使用設備上的放電裝置放電后報警會自動取消。
2, DC test discharge alarm function: when the equipment is completed DC test, when the test door open when the device will automatically alarm, until the use of equipment on the discharge device after the alarm will automatically cancel.
3、試驗放電裝置,隨主機為一體化,改進了以往單獨配備一根放電桿的功能。
3, the test discharge device, with the host as a whole, improved the previous single with a pole function.
4、該試驗設備的電路設有多項保護措施,主要有:過流保護、失壓保護、漏電保護、短路保護、直流試驗放電報警等。
4, the circuit of the test equipment with a number of protective measures, including: over-current protection, voltage loss protection, leakage protection, short circuit protection, DC test discharge alarm, etc..
5、安全保護:
5, safety protection:
(1)門限位保護:不關門,即使通電點實驗開始,設備無任何反應,軟件有:安全門未關閉提示。
(1) threshold protection: do not close the door, even if the starting point of the experiment, the device does not have any reaction, the software has: safety door is not closed prompt.
(2)電壓歸零保護:如果在實驗過程中,突然斷電,下次開機后,會自動回到零位,保證初始電壓為在零位
(2) voltage to zero protection: if in the course of the experiment, a sudden power failure, the next boot, will automatically return to zero, to ensure that the initial voltage is zero
(3)終止電壓保護:可以通過軟件設定終止電壓,保證在升壓過程中如果出現異常升到的電壓后,自動終止并歸零
(3) termination voltage protection: the termination voltage can be set by the software, to ensure that in the process of boosting if abnormal rise to the specified voltage, automatically terminated and zero
(4)高壓機械限位:如果軟件系統失去控制,電壓繼續往上升,到高壓限位后自動歸零如果在擊穿后未判停,通過過流保護器采集數據保證電壓自動歸零有高壓指示燈,通過觀察指示燈的狀態來判斷實在升壓還是在零位如果長時間做實驗,為保證設備的良好運行,設備留有變壓器排氣口,保證變壓器的良好運行,增長使用壽命如果在實驗中,試樣有異味或者出現燃燒和冒煙現象,可以通過排風系統進行排除。
(4) high pressure mechanical limit: if you lose control of the software system, the voltage to continue to rise, to the high pressure limit after auto zero if not to stop in after the breakdown of the overcurrent protection device to ensure the voltage data acquisition automatic zero pressure indicator, by observing the indicator of the state to determine the real boost or in zero if long time to do the experiment, in order to ensure a good operation of equipment, equipment have transformer outlet, to ensure the good performance of the transformer, and increase the service life of if in the experiment, samples or the smell of burning and smoke phenomenon, through the exhaust system were excluded.
(5)獨立接地保護
(5) independent grounding protection
(6)短路保護
(6) short circuit protection
(7)軟件誤操作保護
(7) software malfunction protection
(8)漏電保護
(8) leakage protection
(9)實驗結束放電保護
(9) discharge protection at the end of the experiment
七、 主要配置:
Seven, the main configuration:
1、主機 1臺
1, the host 1 Taiwan
2、升壓裝置 1套
1 sets of 2, booster
3、放電裝置 1套
1 sets of 3, discharge device
4、測量系統 1套
4, 1 sets of measurement system
5、電壓調節裝置 1套
5, 1 sets of voltage regulator
6、數據處理系統 1套
6, the data processing system 1 sets
7、計算機 1臺
7, the computer 1 Taiwan
8、打印機 1臺
8, printer 1 Taiwan
9、A/D轉換器 1個
9, A/D converter 1
10、控制軟件 1套
10, control software 1 sets
11、試驗電極 1套
1 sets of 11, the test electrode
12、放電系統 1只
12, discharge system 1
13、油箱 1個
13, the tank 1
14、試驗臺 1個
14 test 1
15、安全防護系統 1套
15, 1 sets of safety protection system